The next time you visit Plantation Resort, you're bound to notice two big changes.
The first is the improvements made to Fairway Drive. After receiving special permission from the owners of Fairway Drive (Plantation Resort does not own the road), we repaired the roadway by removing an old eroding conduit under the road that was causing road damage and larger and larger sink holes to appear. We also removed the old railroad tie bed just off the traffic circle and fixed the pond bank that was eroding the road base. These areas are all located between the traffic circle and the entrance to the Resort (Double Eagle Drive). We also cut back the railroad tie bed where the Plantation Resort sign is located and poured a concrete curb making it much easier to make the left hand turn onto Double Eagle Drive entering the Resort. After all these repairs were made, we paved the roadway and improved the drainage so that the road will function well for many years to come!
The second improvement you can't miss! A few years ago we paved the beginning of Double Eagle Drive from the entrance to just beyond the entrance to the Health & Swim Club. Now we've now finished the job by paving the rest of Double Eagle Drive all the way to the end to Building 218.
As a bonus, while we were paving Fairway and Double Eagle Drives, several of the parking lots in the Resort were paved at the same time resulting in substantial savings for the HOAs due to the reduction in costs we received by combining all these paving projects into one large project.
These are just a few more of the many improvements we are continually making to improve "your home away from home." We hope you are able to come and enjoy them soon!
No comments:
Post a Comment